ARROWS represented its client in a dispute over compensation for damages caused by a designer who not only prepared the project documentation for the reconstruction of a family house, but also subsequently acted as a construction manager.
As a result of the faulty design and improper execution of the work, the structure was overloaded, static problems occurred and the building came to a standstill, with the risk that the house would have to be demolished.
Legal services included preparing and filing a claim, gathering evidence, working with structural experts and developing a legal strategy to prove the designer's liability. The representation also included negotiating with the opposing party to reach an out-of-court settlement that would minimize costs and risks to the client.
The team was led by Mgr. Lukáš Kubec, an attorney specializing in contract law and litigation, who has long focused on debt recovery and dispute resolution arising from construction contracts. His meticulous preparation and emphasis on efficient procedural procedure played a key role in the entire proceedings.
Thanks to the expertise and commitment of our team, the client was provided with maximum legal protection and a strategic approach leading to a successful resolution of the case.
Interested in how we help our clients? Take a look at our references and find out how we can help you too! Take a look HERE.