Legal Aspects of Developing and Transferring Technical Infrastructure to Cities

Why an agreement with the municipality is the foundation of a project
Cooperation with a municipality is not a one-sided dictation of conditions, but a business negotiation where both parties have their needs. A precisely prepared agreement is a risk management tool – without it, the developer operates in uncertainty and may be left with infrastructure that the municipality refuses to take over.
Planning contract under the new Czech Building Act
The new Czech Building Act (Act No. 283/2021 Coll.) introduced the planning contract as the main tool. This is a public law contract that can also contain private law elements, and it is also subject to the rules of the Code of Administrative Procedure. Relying on old contract templates is therefore risky.
A high-quality planning contract contains a precise specification of the project, the scope of the developer's contribution, a schedule, and security for obligations (e.g., a bank guarantee or a contractual penalty).
What can a municipality commit to and what are its limits?
The municipality acts in a dual role – as a landowner and as a public authority. An agreement that the municipality "will approve a change to the spatial plan" or "will issue a permit" is invalid. However, the municipality can commit, for example, to:
taking steps towards acquiring a change to the spatial planning documentation,
providing cooperation as a party to the proceedings and not filing objections,
granting consent as the owner of neighboring land.
The contract should also include the consequences of failing to meet these commitments, such as the obligation to return the financial contribution. The contract binds the municipality as a legal entity, so it remains valid even after a change in leadership following elections.
From final approval to the transfer of infrastructure
For a developer who wants to build and exit a project, the transfer of roads, utility networks, and public lighting to the municipality or operator is key. The transfer is not automatic – the municipality can refuse to take it over unless bound by a contract. It is ideal to prepare a template of the transfer (purchase or donation) agreement already when concluding the planning contract.
In addition, for final approval, it is necessary to fulfill obligations towards the regional digital technical map, i.e., to secure a geodetic survey in time.
Potential problems | How ARROWS (consultation@arws.cz) helps |
|---|---|
Invalid commitment of the municipality in the contract: project halt and loss of investment. | What we do: we will prepare a planning contract under the new Czech Building Act. |
Refusal to take over infrastructure: the developer bears the management costs. | What we do: we will set the municipality's obligation to take over the infrastructure once conditions are met. |
Dispute over the amount of the contribution: disproportionate demands from the municipality. | What we do: we will negotiate a reasonable and purpose-bound contribution. |
Unclear handover protocol: dispute over whether the work was completed. | What we do: we will prepare complete handover documentation. |
Liability for defects after handover
The contractor is liable for hidden defects of the construction for five years from handover (Section 2629 of the Czech Civil Code). These are defects that already existed at the time of handover but could not be detected.
In addition, municipalities often require a contractual quality guarantee, which can also cover defects arising after handover. It is advisable to precisely define its scope and duration so that it does not cover normal wear and tear.
Summary
Technical infrastructure must be contractually resolved before construction begins – including the conditions of the future transfer, security for obligations, and liability for defects.
Are you preparing a development project or negotiating with a municipality? Contact our Czech legal team at consultation@arws.cz.
Disclaimer:
The information contained in this article is for general informational purposes only and serves as a basic guide to the issue as of 2026. Although we strive for maximum accuracy, laws and their interpretation evolve over time. We are ARROWS Law Firm, a member of the Czech Bar Association (our supervisory authority), and for the maximum security of our clients, we are insured for professional liability with a limit of CZK 350,000,000. To verify the current wording of the regulations and their application to your specific situation, it is necessary to contact ARROWS Law Firm directly (consultation@arws.cz). We are not liable for any damages arising from the independent use of the information in this article without prior individual legal consultation.