Successful representation of a client in a dispute over a contractual penalty for delay in remedying a defect in the work
ARROWS represented a client in a dispute over the payment of a contractual penalty for delay in removing a defect in construction work when groundwater penetrated the building.

The contractor denied liability for the defect, which led to court proceedings, a key element of which was an expert assessment.
The legal advice included the preparation and presentation of evidence, including expert reports proving the contractor's liability, strategic argumentation and representing the client in the court proceedings. Legal support included negotiating with the opposing party to reach an amicable resolution in the client's best interests.
The team was led by Mgr. Lukáš Kubec, an attorney specializing in contract law and litigation. Thanks to his experience in contractual relations and disputes over work, effective protection of the client's rights and a successful outcome of the proceedings were achieved.
Thanks to the precise work of our colleagues, we managed to defend the client's claims and confirm the contractor's liability for defects in the construction work.
Disclaimer:
The information contained in this article is for general informational purposes only and serves as a basic guide to the issue as of 2024. Although we strive for maximum accuracy, laws and their interpretation evolve over time. We are ARROWS Law Firm, a member of the Czech Bar Association (our supervisory authority), and for the maximum security of our clients, we are insured for professional liability with a limit of CZK 400,000,000. To verify the current wording of the regulations and their application to your specific situation, it is necessary to contact ARROWS Law Firm directly (consultation@arws.cz). We are not liable for any damages arising from the independent use of the information in this article without prior individual legal consultation.